Process Metrics:
Throughput Time (min): 152.50
Cycle Time (min): 47.50
Capacity per hour: 63.16
Utilization: 84.21%
Batch size 50 units
Workstation A Workstation B Workstation C
Setup time: 15.00 Setup Time: 25.00 Setup Time: 60.00
Per unit time: 0.65 Per unit time:0.30 per unit time: 0.10
Time unit: Min Time unit: min Time unit: min
Utilization: 100% Utilization: 84% Utilization: 68%
Given a batch size of 50 doughnuts, compute the cycle time of each station. (Remember to divide the time in half for Flavoring (C), as there are two stations working in parallel.) Which station is the bottleneck?