Open PowerWorld Simulator case Problem 11_24, which models the Example 6.9with transient stability data added for the generators. Determine the critical clearingtime (to the nearest 0.01 second) for a fault on the line between buses 2 and 5 at thebus 5 end which is cleared by opening the line.