Determine the copper recovery from the proposed plant


Problem

The Thoroughbred Consulting Group is designing a plant to produce a copper concentrate of 24.5% at 30 tons per hour. The mine produces average ore grade is 0.9% at 2400 tons per hour. Determine the copper recovery from the proposed plant.