Determine the capitalized cost of a power plant which requires PhP10,000,000 for original construction with a PhP500,000 operating expenses, an annual maintenance of PhP200,000 for the first five years and PhP250,000 thereafter, and PhP1,000,000 every 8 years for replacement of equipment with interest at 15% per year.