Design the testing required for the billing system and you


Assignments

1. Design the testing required for the billing system. You should consider program, integration, and system testing in your test plan.

2. Identify the people who need training on the new system. For each group, describe the type of training you would recommend and list the topics you would cover.

3. In an earlier chapter, a preference was expressed for a transition to the new system utilizing a direct cutover method, timed around the move from one academic year to the next. All fixed fee billing for an academic year is completed in April, and commences in July for the following academic year. Drop-In After-Care billing continues for the month of May, and a final bill is issued during the second week of June, the week after classes end. Do you think this is feasible? Would you recommend another method for transition?

4. Develop a data conversion plan that specifies which data items must be entered, the order in which the data should be entered, and which data items are the most time critical.

When all of the answers for the given project are completed and a consensus is reached, everyone in the group will attach the completed answers to the assignment in the Week 8 assignments area. 

Solution Preview :

Prepared by a verified Expert
Strategic Management: Design the testing required for the billing system and you
Reference No:- TGS0768899

Now Priced at $40 (50% Discount)

Recommended (97%)

Rated (4.9/5)