A CASE STUDY: "MILAN METRO LINE 5"
QUESTIONS:
1. Design the architecture of the PF deal, showing actors, roles, flows of funds, contracts and responsibilities.
2. Analyze the risk management side of the deal. Does it work the "pass-through" mechanism?
3. What is the rationale for the "availability fee"? What are the potential scenarios?