You are on the design team for building an overhead dridge crane for use in house within the company. the disn team is considering a proposal to place a switch box on the wall with toggle on/off switch for control of the bridge, trolley, and hoist, respectively. what would be your desin imput to this committee? explain the rationale behind your commendations.