design a horizontal curve for a two-lane road. The road has 12-ft. lanes. Due to expansive excavation, it is determined that a maximum of 34 ft. can be cleared from the road's centerline toward the inside lane to provide for stopping sight distance. Also, local guidelines dictate a maximum super elevation of .08 ft/ft. What is the highest possible design speed for this curve?