These are the requirements
Topic - Autoclaved aerated concrete (AAC)
Please follow the instructions given below
CHAPTER 1
INTRODUCTION (Minimum 3 pages)
1.1 Overview of the project
Provide background information on the chosen project. Include the rationale for the project
(Why is it worth undertaking the project?).
1.2 Problem definition
Describe what the project is all about. What are you going to do? Describe the existing system / Any problem or issues, which require this project to be undertaken.
1.3 Objectives of the project
Project objectives tell what the project aims to achieve. You want to achieve your goal and the Objectives state how this will be done. What major tasks will be undertaken and what you're major Targets are. What is this project trying to accomplish and why?
1.4 Project scope
Provide the details of the work that needs to be accomplished to deliver the product with its Required features and functions.
CHAPTER 2
Methodology (Minimum 3 pages)
3.1 METHODOLOGY
Provide a comparative study of different methodologies and select a best methodology to Develop the product (if necessary). The reason for choosing a particular methodology must be Justified properly. Preferably show your methodology in a Flow Chart form as well.
3.2 Project plan
Project plan section must include various activity plans, which support in the overall guidance of the project [Communication plan, acceptance plan, resource plan, risk management plan]
References (1 page)
References must be arranged in alphabetic order. Each entry of the reference must be referred To at least once in the body of the project report (in-text citation) using Harvard referencing 20 sources shall be provided with Harvard style for the topic (Autoclaved aerated concert - AAC)
Please follow the instructions. The percentage of plagiarism shall be not more than 2%.
Number of references shall not be less than 20 of the topic.