Describe the wbs that breaks down the work elements in sow


Project Scope Assignment: Bathroom Renovation

Refer to the project proposal for a bathroom renovation. For this assignment, you will be expanding on that project to include a project scope document (i.e., the definition of what needs to be done to produce the project deliverables and to satisfy the customer). The project scope document should satisfy the following components:

i. Customer Requirements: Describe the customer requirements through functional or performance specifications of the project's end product/service.

ii. Statement of Work (SOW): Explain the SOW including the work elements and milestones to be performed. This should include risks associated with the project.

iii. Deliverables: Formulate a schedule of the deliverables including milestones throughout the project and the final deliverable at the conclusion of the project. Compile a Gantt chart (instructions and example are included within the Unit III Lesson).

iv. Work Breakdown Structure (WBS): Describe the WBS that breaks down the work elements in the SOW into specific work tasks.

v. Acceptance Criteria: Develop and build upon the acceptance criteria discussed briefly in the project proposal.

While project scope documents may vary from project to project, your document should contain a thorough description of each section. Additionally, please include an introduction paragraph. If your project varies in such a way that a thorough description is not possible, you will then include elements of the section in question to give an outline of what is provided. See the Unit III Lesson for additional insight on compilation of a project proposal.

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Describe the wbs that breaks down the work elements in sow
Reference No:- TGS03051555

Now Priced at $30 (50% Discount)

Recommended (93%)

Rated (4.5/5)