Homework: Project Management
Length: 4 pages.
Procurement Control
• Describe and compare procurement control and methods of purchase and contract control.
• Give examples of at least two purchase and contract control methods in use on a project with which you are familiar, or on one that you identify through research.
• Make sure your text includes:
o A clear, researched, paraphrased definition of procurement control;
o Techniques for purchase and contract control; and
o Two examples of those control methods in use on projects.
• Conclude with an example of a project not currently addressing purchase and contract control, but which could benefit from using such controls.
Format your homework according to the following formatting requirements:
o The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.
o The response also includes a cover page containing the title of the homework, the student's name, the course title, and the date. The cover page is not included in the required page length.
o Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.