Assignment: Procurement Control
a) Describe and compare procurement control and methods of purchase and contract control.
b) Give examples of at least two purchase and contract control methods in use on a project with which you are familiar, or on one that you identify through research.
c) Make sure your text includes:
a. A clear, researched, paraphrased definition of procurement control;
b. Techniques for purchase and contract control; and
c. Two examples of those control methods in use on projects.
d) Conclude with an example of a project not currently addressing purchase and contract control, but which could benefit from using such controls.
Format your assignment according to the give formatting requirements:
1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also includes a cover page containing the title of the assignment, the course title, the student's name, and the date. The cover page is not included in the required page length.
3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.