Case Study Overview:
In conventional business and government megaprojects--such as hydroelectric dams, chemical-processing plants, or big-bang enterprise-resource-planning systems--the standard approach is to build something monolithic and customized. Such projects must be 100% complete before they can deliver benefits: Even when it's 95% complete, a nuclear reactor is of no use. On the basis of 30 years of research and consulting on megaprojects, the author has found two factors that play a critical role in determining success or failure: replicable modularity in design and speed in iteration. The article examines those factors by looking at well-known megaprojects, both successful ones, and cautionary tales.
Case Study: Better Project Management | Harvard Business Publishing Education.
Using the attached link do the following:
Your team has been assigned to build a house for your sponsor Smith Thomas. The budget for the house is $200,000, and the house must be completed in 6 months.
• Using the above link create a project canvas similar to the one on page 8
• Describe your life cycle approach used to manage your project and why?
• Describe at least five key stakeholders and your communication strategy
• Describe how you will track scope and scope changes
• Describe deliverables that will be created to track progress
• Describe at least five risks and your mitigation strategy
Format your homework according to the give formatting requirements:
• The answer must be using Times New Roman font (size 12), double spaced, and typed, with one-inch margins on all sides.
• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.
• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.