Describe how you will conduct change control meetings


Homework: Methodology

For this individual homework, you will search the academic databases and professional journals to develop a generic project change control methodology that would be appropriate for most projects. You can use your team project for reference or as an example (use the attachment if needed)

The methodology or process will include the following elements:

I. Change control procedures - what are the policies and procedures for approving, validating, and implementing change?

II. Change control plan - a brief outline of how changes will be managed/controlled.

III. Change control meetings and communication - describe how you will conduct change control meetings and communicate project changes to stakeholders.

IV. Change authorization procedures - what are the levels of authority for reviewing/approving/implementing changes?

V. Change control system(s) - What are the project management information systems (PMIS) used for tracking and controlling changes (include at least one example of a template as part of your change control system).

Format your homework according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Business Management: Describe how you will conduct change control meetings
Reference No:- TGS03104707

Now Priced at $40 (50% Discount)

Recommended (95%)

Rated (4.7/5)