Demonstrate a quality control system for production


Assignment Problem: Quality Management

Learning Outcome 1: Develop and demonstrate a quality control system for production.

Learning Outcome 2: The implementation of some tools for Data Analysis and Quality Control;

Coursework scenario:

Your company has been running a high volume production of a product. You as Quality Manager of the company have been provided with 10 consecutive samples of 10 items each.

Tasks to be carried out and presented in a succinct (about 1500 words, 15 pages max excluding appendices) report in MS Word format:

Part 1. Considering accuracy, range, productivity, cost, skills, etc, select an appropriate measuring instrument and both visually and analytically test the hypothesis for normal distribution of the parameter.... Use the following table to arrange the data.

Part 2. Estimate the actual process capability. Calculate and analyse the expected number of rejects in batch of 1,000,000 items, if the specified tolerance is between ..... and ........ Make relevant comments upon achieving 6 Sigma Quality.

Part 3. Identify and prepare appropriate quality control charts using the data from the table above. Analyze the information presented on them and compare with results obtained in (1).

Get in touch with the proficient and skilled tutors of Quality Management Assignment Help service for making your academic life stress-free.

Tags: Quality Management Assignment Help, Quality Management Homework Help, Quality Management Coursework, Quality Management Solved Assignments 

Attachment:- Quality Management.rar

Request for Solution File

Ask an Expert for Answer!!
Other Management: Demonstrate a quality control system for production
Reference No:- TGS03053834

Expected delivery within 24 Hours