Demand for a certain subassembly in a toy manufacturing facility at the North Pole is 96 items per eight-hour shift of elves. The following six tasks are required to produce one subassembly.
Task
|
Time Required (minutes)
|
Predecessor Tasks
|
a
|
4
|
-
|
b
|
5
|
a
|
c
|
3
|
A
|
d
|
2
|
b
|
e
|
1
|
b,c
|
f
|
5
|
d,e
|
What is the required cycle time? Theoretically, how many stations will be required? Balance the line. What is the line"s efficiency?