Problem
Define utilization as time required/time available. Assume time available is one 8-hour shift per day and that there are 21 days in September. What is the utilization of operations such as the CNC drill, CNC router, and artwork generation? The plant as a whole? What else does Exhibit 2 reveal about Dasher's operations?