--%>

Define the scope of the project create a work breakdown


You have recently been appointed head of human resources and are now in charge of managing a small team. Your next project is to revamp the compensation and benefits package employees are receiving at your company. Design a plan for the human resource project without the use of MS Project or similar software. Note: You will have to make assumptions or create fictitious data for this assignment. Be clear about these assumptions and data for your professor to follow along.

Write a six to eight (6-8) page paper in which you:

Construct a project charter to revamp the compensation and benefits package.

Design a communication plan for the project.

Define the scope of the project.

Create a work breakdown structure including numbered components. Submit your WBS by creating a table inside your assignment.

Use at least four (4) quality academic (peer-reviewed)resources in this assignment.

Your assignment must:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required page length.

Solution Preview :

Prepared by a verified Expert
HR Management: Define the scope of the project create a work breakdown
Reference No:- TGS01533682

Now Priced at $50 (50% Discount)

Recommended (90%)

Rated (4.3/5)