Problem
Why may the setting time of concrete be substantially different from the setting time of the cement from which the concrete is made? Define the initial and the final setting times as measured by the penetration resistance method (ASTM C-403). What is their significance in the concrete construction practice?
The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.