Assignment 2.1: Define Scope with a Work Breakdown Structure
 
 In the previous module, you began to plan for scope by developing a  Project Charter and a Project Scope Statement. Now you will continue  with Scope Planning by developing a work breakdown structure (WBS). 
 
 Procedure
 1.Review the results from the previous application (the Project Charter and the Project Scope Statement).
 2.Create a work breakdown structure for the project, using these  criteria: ?It must be easy to interpret, such as a hierarchical list  and/or a flow chart.
 
 •It must be possible for your instructor and other classmates to view it.