1.Compute the amount of chlorine required for disinfection in pounds per day(lb/d). Estimate the annual cost for disinfection using chlorine.
Flow Rate= 30 milloin gallons per day.
2.Determine appropriate dimensions of the finished water clearwells to achieve adequate disinfection using chlorine. Flow Rate Q = 30 million gallons paer day.
3.Cylinders C and D are attached to the end of the cable. if D has a mass of 600 kg, determine the required mass of C, the maximum sag h of the cable, and the length of the cable between the pulleys A and B. The Beam has a mass per unit length of 50 kg/m.