Crude oil having a specific gravity of 0.887 is flowing through a piping arrangement at a total volumetric flow rate of 30 gallons/min at the inlet in a pipe (pipe A). Pipe A, which forms the first part of the piping arrangement, is a 2-in schedule 40 pipe. Pipe A is widened to a 3-in schedule 40 pipe as pipe B. pipe B then divides into two equal 1.5-in schedule 40 pipes (two pipes C). An equal quantity of crude oil flows through each of the pipes C. What is the total flow rate in each pipe? What is the average velocity in each pipe? What is the mass velocity in each pipe?