Problem 1
Create two association Rules and calculation the confidence, Lift ratio, and describe your findings.
Formal Shirt
|
Formal Pants |
Jeans |
t-shirt |
Formal Shoes |
Belt |
Formal Pants |
Formal Shirt |
t-shirt |
Formal Shoes |
|
|
Formal Shoes |
Formal Shirt |
Formal Pants |
|
|
|
Formal Shoes |
Jeans |
t-shirt |
|
|
|
Formal Pants |
t-shirt |
Jeans |
Formal Shirt |
Belt |
Formal Shoes |
Formal Shirt |
Formal Pants |
Formal Shoes |
Jeans |
|
|
Jeans |
Belt |
|
|
|
|
Formal Shoes |
Formal Pants |
Formal Shirt |
t-shirt |
Jeans |
Belt |
Formal Shirt |
Formal Pants |
t-shirt |
Formal Shoes |
Belt |
|
Formal Shoes |
Formal Pants |
Formal Shirt |
Belt |
|
|
Belt |
t-shirt |
Jeans |
Formal Shoes |
|
|
t-shirt |
Formal Pants |
Formal Shirt |
Formal Shoes |
|
|
Formal Pants |
Formal Shirt |
Formal Shoes |
|
|
|
Formal Shoes |
Formal Pants |
Jeans |
Formal Shirt |
|
|
Jeans |
Formal Pants |
Formal Shoes |
|
|
|
Formal Pants |
Formal Shoes |
Belt |
Formal Shirt |
|
|
Formal Shoes |
Formal Pants |
Formal Shirt |
|
|
|
Formal Pants |
t-shirt |
|
|
|
|
Formal Shoes |
Formal Pants |
Belt |
t-shirt |
Formal Shirt |
Jeans |
Belt |
Formal Shoes |
Formal shirt |
Formal Pants |
|
|
Jeans |
t-shirt |
Formal Pants |
|
|
|
Formal Shirt |
Formal Pants |
Jeans |
t-shirt |
Formal Shoes |
|
Formal Shoes |
t-shirt |
|
|
|
|
Jeans |
Formal Shoes |
Belt |
Formal Shirt |
|
|
Formal Pants |
Formal Shoes |
t-shirt |
Formal Shirt |
|
|
Belt |
Formal Pants |
Jeans |
|
|
|
Formal Shirt |
Jeans |
t-shirt |
Belt |
|
|
Jeans |
Formal Pants |
Belt |
t-shirt |
Formal Shoes |
Formal Shirt |
Formal Shirt |
Jeans |
Formal Shoes |
|
|
|
Formal Shirt |
Jeans |
Formal Pants |
Formal Shoes |
Belt |
|
Problem 2:
Chawdhry Inc is interested in making Laptop Bags for the business world. They will produce two types of bags: Backpacks and Leather Sleeves. The Backpack will sell for $15 and the Sleeve will sell for $25
There are four processes that go into making the bags. They are detailed below with the amount of time in hours it takes to make EACH bag.
|
Processing Time |
Cutting and Dying |
7/10 |
1 |
Sewing |
1/2 |
5/6 |
Finishing |
1 |
2/3 |
Inspection and Packaging |
1/10 |
1/4 |
The max times available for each of these production steps is listed below. Determine how many of each bags should be produced in order to maximize profits for Chawdhry, Inc.
|
Max Time |
Cutting and Dying |
630 |
Sewing |
600 |
Finishing |
708 |
Inspection and Packaging |
135 |
Parameter
Model
Constraints