--%>

Create the project network and show the critical path


Assignment: Train Reservation System

Based on your project scenario which has been suggested by you or by your instructor and approved by your instructor, answer the following three questions?

1. Using any project management tool, draw the project Gant Chart?

2. Using any project management tool, draw the project network and show the critical path?

3. Using Excel sheet, suppose the project will finish within 6 years (Starting from year 0). Follow your instructor instructions about the value of:

1- Discount Rate
2- Cost for every year
3- Benefits for every year

Your task is to calculate the following:

1- Discount factor for every year.
2- Discounted Benefits for every year.
3- Discounted Cost for every year.
4- Discounted Benefits-Cost for every year
5- Cumulative Benefits - Cost
6- Calculate NPV
7- Calculate ROI
8- Determine the payback in which year (If possible).
9- Explain the situation of your project. (over, under, behind the budget). What your value means?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Computer Engineering: Create the project network and show the critical path
Reference No:- TGS02978355

Now Priced at $35 (50% Discount)

Recommended (93%)

Rated (4.5/5)