A production line assembles two models of hair dryer: standard (s) and deluxe (D). Each S needs 4 minutes of assembly time and each D 12 minutes. Marketing sells twice as many Ss as Ds.
Create mixed model sequence for 2 hair dryers. Make it as well balanced as possible.
Determine the cycle time, and how many times can it repeat in the 480 minute day?