Create a wbs for the project and list necessary tools


Assignment: Sequencing Scenario

Define activities for a project based on the scenario you choose.

Scenario: You work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer.

Include the following:

a) Identify the scope of the project.
b) Define the needs of the stakeholders.
c) Create a WBS for the project.
d) List necessary tools and techniques.
e) List activities, activity attributes, and milestones for the project.
f) Sequence the activities in a chart or diagram.

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Create a wbs for the project and list necessary tools
Reference No:- TGS03108730

Now Priced at $35 (50% Discount)

Recommended (98%)

Rated (4.3/5)