A project team has estimated the costs associated with the development and maintenance of a new system. One approach requires a more complete design and will result in a slightly higher design and implementation cost but a lower maintenance cost over the life of the system. The second approach cuts the design effort, saving some dollars but with a likely increase in maintenance cost.
a. Enter the following data in the spreadsheet.
Print the result.
b. Create a stacked bar graph that shows the total cost, including the design, implementation, and maintenance costs. Be sure that the chart has a title and that the costs are labeled on thechart.