Sycamore Plastics (SP) is a manufacturer of polyethylene plastic pellets used as a raw material by manufacturers of plastic goods around the U.S. SP currently operates four manufacturing centers in Philadelphia, PA; Atlanta, GA; St. Louis, MO; and Salt Lake City, UT. The plants have different capacities and production costs as indicated in the table below.

PLANT

MAXIMUM CAPACITY
(× 100,000 LBS.)

PROD. COST
(PER 1,000 LBS.)

Philadelphia

8.3

$324.00

Atlanta

9.3

$274.00

St. Louis

12.1

$304.00

Salt Lake City

10.1

$249.00

SP currently has six contract customers located in New York City; Birmingham, AL; Terre Haute, IN; Dallas, TX; Spokane, WA; and San Diego, CA. Transportation costs between the plants and various customers, as well as contracted demand from each customer, are shown in the table below.

 

TRANSPORT COSTS PER 1,000 LBS.

FROM/TO

NYC

BIRMINGHAM

TERRE HAUTE

DALLAS

SPOKANE

SAN DIEGO

Philadelphia

$47

$54

$58

$64

$70

$87

Atlanta

57

44

60

61

72

84

St. Louis

59

62

52

56

57

72

Salt Lake City

74

73

69

59

50

62

Total Demand
(× 1,000 lbs.)

528

417

928

603

328

403

• Create a solver model and find the optimal solution to help SP develop a distribution plan that will minimize costs to supply the customers' demand.