Find out the surveillance methods which are best suited for a construction contract or information technology contract. Support your position with an illustration.
Assume that you are the COTR on a U.S. Army project by using three-kilowatt electrical generators. Find out who decides the level of quality in a contract. Speculate on how your responsibility would change if the generator were to fail an inspection.