An advertising production team is charged with reducing the number and dollar amount of the advertising errors, with initial focus on the ran-in-error category. The team collects data, including the number of ads with errors, on a Monday-to-Saturday basis. Table SH14.1 includes the total number of ads and the number containing errors for a period of one month (see the file SH14-1). (Sundays are excluded because a special type of production is used for that day.)
What is the first thing that the team from the advertising production department should do to reduce the number of errors? Explain.
a.) construct the appropriate control chart for these data.
b.) Is the process in a state of statistical control? Explain.
c.) What should the team recommend as the next step to improve the process?