Construct a cause and effect diagram where quality of life is the output or response (performance) measure. Be sure to label each input variable with either a C, N, or X, based on how you are controlling these variables today. Suggest possible changes, including SOPs, that will reduce the variability of the input variables and consequently improve the performance measure.