Consider the following three-station production line with a


Consider the following three-station production line with a single product that must visit stations 1, 2, and 3 in sequence. its total production line time is 3 hrs 47 mins, bottle neck rate is 200, Wo is 9.333.

  1. Can the three station production line make this takt time? If not how many machines would I need at station 1, 2, and 3? calculate takt time.

please show calculations and diagram

 

 

Request for Solution File

Ask an Expert for Answer!!
Finance Basics: Consider the following three-station production line with a
Reference No:- TGS01119328

Expected delivery within 24 Hours