Consider an electric part with two components in series


Consider an electric part with two components in series (component A and component B). Component has a reliability of 88%, while component B has a reliability of 94%. It is known that if the part fails, it will cost the company $1000.

What is the system reliability and the expected failure cost per part?

You are trying to reduce the expected failure cost per part, and you have three improvement options. Find the system reliability and total (improvement plus failure) cost per part for each of the three options, and then suggest which of the three (if any) improvements you would recommend. (round all reliability calculations to 4 decimals)

Improvement 1: add an 80% reliable backup for component A. The backup costs $50 per part.

Improvement 2: add 90% reliable backup for component B. The backup costs $50 per part.

Improvement 3: add a backup for component A and add a backup for components B. Backups have same reliabilities and costs as in improvements 1 and 2

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Consider an electric part with two components in series
Reference No:- TGS01139512

Expected delivery within 24 Hours