Consider a project with the following cash flows -100, 230 and -134 at time 0, 1 and 2, respectively. Obtain the IRR(s) of the project.
A. 10% and 20%
B. 10%
C. 20%
D. IRR does not exist
Consider a project with the following cash flows -100, 230 and -134 at time 0, 1 and 2, respectively. Obtain the NPI (Net Profitability Index) of the project if the cost of capital is 10%.
A. 0.0078
B. 0.0084
C. -0.0078
D. -0.0084