Consider a continuous review inventory system. Demand is normally distributed with an average of 44,000 per month and a monthly standard deviation of 1320 units. Lead time is two weeks (assume one month is four weeks). If the firm desires only an 81% cycle service level, how many units of safety stock should be held?