Problem
Conduct a simulation for 10 weeks using the random numbers provided below to determine the machine breakdowns per week as well as the repair time. Compute the weekly average number of machine breakdowns and the weekly average repair time. If it costs $50 per hour to repair a machine when it breaks down (including lost productivity), determine the average weekly breakdown cost.