Harrison Company makes two products and uses a traditional costing system in which a single plant-wide predetermined rate is computed based on direct-labor hours. Data for the two products for the upcoming year follow:
Rascon Parcel
Direct material cost per unit $13.00 $22.00
Direct labor cost per unit 6.00 3.00
Direct labor hours per unit .40 .20
Number of units produced 20,000 80,000
These products are customized to some degree for specific customers.
Required:
1. The company's manufacturing overhead costs for the year are expected to be $576,000. Using the company's traditional costing system, compute the unit product costs for the two products.
2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year:
Rascon Parcel Total
Engineering design time 3,000 3,000 6,000
Compute the unit product cost for the two products using the proposed ABC system.