Topez inc makes one product and has set the following standard 4 material and labor
standard quanity or hr per unit - direct material=7 pound
- direct labor=2.5 hrs
standard price or rate 7 pound- direct labor=9.00 per hr
standardcost per unit direct material direct labor=22.50
during the past month the company purchase 6000 pound of direct material at a cost of 16.500
all of this material was used in the production of 1,400 unit of product.direct labor cost total 28.500 4 the monuth
material quanity variance=1.200 u total material spending variance= 300 labor efficiency varience=4500 f
Prepare and compute the standard price per pound 4 material
Compute the standard quanity allowed 4 material for the month production I need to comute the standard quanity of material allowed per unit of products