Problem
Compute the "Multifactor Productivity" measure for a production of chocolate bars in which the usable output was 30,000 units, produced by 6 workers who used 450 pounds of material. Assume 40 hours work in a week, and an hourly wage of $12. Overhead is 1.5 times weekly labor cost. Material cost is $ 6 per pound.