Problem 1:
Asset 1 Asset 2
E(R1) = .12 E(R2) = .16
E(s1) = .04 E(s2) = .06
a. Calculate the expected return and expected standard deviation of a two stock portfolio when r1,2 = - .60 and w1 = .75.
b. Calculate the expected returns and expected standard deviations of a two stock portfolio when r1,2 = .80 and w1 = .60.