Question: 1. Draw a product structure tree for the BOM for the square patio planter. If there are plans to make eight patio planters, how many bolt and nut sets will be needed?
2. Complete the MRP record for a bicycle frame using a L4L lot-sizing strategy. Considering the lead time, where should scheduled receipts be shown? Repeat using a fixed order quantity of 100 frames. Again, show scheduled receipts. Compare and contrast the results. What are the benefits and drawbacks to each approach?