Complete an accident prevention plan for a company. The Complete list of content/sections to be covered is listed in the contents section below. The company profile, which you need to match to the content/sections, is listed in the company profile section below. The expected finished length of this assignment is from 75 to 100 pages.A template has been provided to help you organize your Accident Prevention Plan.
Industrial Safety Engineering
Spelling/Grammar Checking: Remember to do your spelling and grammar checking before turning your assignments in. When doing the spelling/grammar checking keep in mind that some words such as mush and must, woods and words, or here and cow, will not be caught by either check. To correct these problems, you will need to proofread your work.
Page Numbers: Any assignment that has more than one page, needs to have page numbers on it. Please place your page numbers on the bottom of the page. In MS Word, use the footer selection and place the page number in the bottom center orbottom right of the page.
Content: (Major Contents/Sections Check-Off List)
1. Title Page
2. Table of Contents Page
3. Divider Pages
4. Introduction
A. Purpose & Intentions
B. Company Presidents Statement
5. Management Responsibilities
A. Manager Responsibilities
B. Supervisors Responsibilities
6. Employee Orientation
A. How and When
B. Emergency Action Plan
C. Emergency Shutdown Procedures
7. Injury and Illness Procedures
A. Procedures
B. Record Keeping
C. Supervisor Responsibilities
D. Report Form
8. Incident/Accident Investigation Procedures
A. Procedure Steps
B. Worksheet Form
C. Incident/Accident Table
9. Safety Guidelines
A. Guidelines
B. Equipment Specific
C. Individual Specific
10. Safety Disciplinary Policy
11. Safety Awareness Program
A. Safety Committee
B. Safety Meetings
C. Safety Training and Forms
D. Safety Award Program
12. Appendices
A. MSDS
B. State & Federal Posters
C. OSHA Forms and Instructions
Company Profile:
Company Size: 350 employees
Company Product: Custom manufacture of industrial hardened computers (CPU, Keyboards, etc)
Processes at factory include:
Circuit board assembly
Circuit board production
Metal case production
Plastic forming processes
Plastic pellet storage and transport to machines
Shipping/receiving
Specific equipment in factory:
Air compressor
Conveyors
Electric forklift
Hoists
Metal punch presses
Metal bending and cutting machines
Plastic injection molding machines
Plastic sheet forming equipment
Shearing machine for sheet plastic
Safety Promotion Budget: $8,000 annually.