To which roles would you assign the following tasks?

• Change a subsystem interface to accommodate a new requirement.

• Communicate the subsystem interface change to other teams.

• Change the documentation as a result of the interface change.

• Design a test suite to find defects introduced by the change.

• Ensure that the change is completed on schedule.