Cameron Manufacturing Co.’s static budget at 5,000 units of production includes $40,000 for direct labor and $5,000 for variable electric power. Total fixed costs are $20,000. At 8,000 units of production, a flexible budget would show variable costs of _________ and fixed costs of ________.