Design a workstation to make a snack and a drink. For example, the task could be to make popcorn and hot chocolate. The workstation must include 2 machines. The task must include at least 4 ingredients with at least 1 ingredient requiring 2 operations (wash and slice, for example). The task must include use of at least 1 hand tool. Both machines must be busy simultaneously at some point in the task. If you have questions regarding whether the chosen task meets requirements, ask the instructor.

a) Clearly describe the snack and drink being made at the workstation.

b) Make an Operations Process Charts to show the processing requirements of the snack and another Operations Process Chart to show the processing of the drink. Use conventional notation and formatting.

c) List the 2 machines, at least 4 ingredients, and at least 1 hand tool used within the workstation. Be specific in your identification of machines and starting state of the ingredients.

d) Sketch the workstation layout neatly. Label the sketch carefully.

e) Create a Multiple Activity Chart using estimated times for each step of the task. Use conventional notation and formatting. The status of the operator and of each machine should be documented in separate columns. The status of the hand tool does not need to be documented. Show calculation of the utilization of the operator and each machine at the bottom of the chart.

f) Write a paragraph to evaluate the task performance using the Principles of Work Design. Specifically discuss at least 5 principles.

Your answer must be typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Calculation of utilization of operator and machine
Reference No:- TGS02001955

Expected delivery within 24 Hours