Question: Rapid City Radiology, Inc. manufactures chemicals used in radiological imaging systems. The controller has established the following activity cost pools and cost drivers.
 
Activity cost pools                  Budgeted overhead cost         cost driver                                           budgeted level for cost driver                   pool rate
Machine setups                       $1,000,000                            Number of setups                                250                                                      $4,000 per setup
Material handling                    300,000                                 Weight of raw material                       75,000 lb.                                            $4 per pound
Hazardous waste control        100,000                                   Wght of hazardous chemicals used    10,000 lb.                                            $10 per pound
Quality control                        300,000                                  Number of inspections                        2,000                                                   $150 per inspection
Other overhead costs              800,000                                  Machine hours                                     40,000                                                 $20 per machine hr.
Total                                        $2,500,000
Calculate the unit costs of a production order for 100 specially coated plates used in radiological imaging. In adition to diret material costing $210 per plate and direct labor costing $60 per plate, the order requires:
Machine setups                                               4
Raw material                                                   800 pounds
Hazardous materials                                        400 pounds
Inspections                                                      4
Machine hours                                                 60