Consider the IEEE 14-bus system given in Part I of this project. Assume that each generator has a subtransient reactance of 15% on the 100MVA base. Conduct short circuit analysis before and after modifying your system for the following:
Calculate the subtransient fault current seen by each circuit breaker due to a solid three-phase fault occur at all bus locations.
Calculate the subtransient fault current seen by each circuit breaker due to a three-phase fault through an impedance of (0.1+ 0.your two digit serial number) occur at all bus locations.
Find out the proper capacity (in MVA) needed of each circuit breaker in these busses.