Problem: Calculate the recycled content value for one cubic yard of concrete based on the LEED requirement. The concrete mixture design uses 200 lbs of Portland cement, 50 lbs of recycled pre-consumer SCMs, and other conventional concrete raw materials. The total cost of cementitious materials is $35.