Calculate the predetermined rate for the plant using fbc


Homework

Lotus Ltd has identified the following overhead costs and cost drivers for next year

Overhead Items E (cost) $
Power 15000
Maintenance cost 7800
Ordering cost 6150
Set ups cost 4500
Cost Driver E( activity)
Number of setups 400
Number of orders 4,000
Machine Hours 5,000
Kilowatt hours 52000
The following is one of the jobs completed during the year
Product A Product B
Direct materials $1200 $1300
Hourly rate 25 30
Units completed 125 150
DLH 140 70
Number of setups 4 6
Number of orders 20 9
Machine hours 250 100
Kilowatt hours 75 48
Actual overhead $1500 $950

The company's practical activity is 9800 machine hours

Task

Part I

• Calculate the predetermined rate for the plant using FBC based on machine hours for each job

• Calculate total product cost using FBC based on Machine hours for each job

• Calculate the unit cost for each Product

• Is the overhead over-applied or under-applied?

Part II

• Calculate the predetermined rate for the plant using ABC based on machine hours for each job

• Calculate product cost under ABC.

• Calculate the unit cost for each Product [ABC]

• Is the overhead over-applied or under-applied under ABC?

• Compare the result of FBC and ABC.

Format your homework according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Cost Accounting: Calculate the predetermined rate for the plant using fbc
Reference No:- TGS03124811

Now Priced at $60 (50% Discount)

Recommended (99%)

Rated (4.3/5)