Problem: Quantitative Risk Assessment: Assume the following information:
Probability of failure
Maturity = .3
Complexity = .3
Dependency = .5
Consequences of Failure
Cost = .1
Schedule = .7
Performance = .5
Calculate the overall risk factor for this project.
Would you assess this level of risk as low, moderate, or high? Why?